Electrical smart microgrid Princess Elisabeth Station
Laborelec made the complete electrical analysis converting the theoretical model of the pre study, done by the engineering company 3E, into a detailed operational model. After this we coordinated the detailed study together with Schneider Electric for the electrical boards and switchgear and Pro Engineering for the electrical drawings.